bpm_project_assessment_collaboration2.jpg
Home arrow Project Health Check
BPM Project Health Check PDF Print E-mail

(Example Only)



The following is an example BPM Project Health Check Chart detailing the results for Strategic Alignment, from within the completed BPM Project Assessment. The results show the current results for that Core Area (each of the five elements within the Core Area is scored out of a possible 20), the "Potential Maturity Growth" reflects the growth that could be achieved with the introduction of more BPM Project Initiative "best practices".

Clicking a "slice" within the Pie-Chart allows that slice to be segregated.

You need to upgrade your Flash Player
Created with joomPie v1.1




If the interactive pie chart above is non-active a static screen shot is shown below

Example BPM Project results chart

 
< Prev   Next >
© 2017 bpmprojectassessment.com